Book contents
- Frontmatter
- Dedication
- Contents
- Acknowledgements
- Foreword
- Introduction
- Across the Three Pagodas Pass
- Translator’s Acknowledgements
- Preface
- Chapter 1 Departure for the Front
- Chapter 2 In Indo-China
- Chapter 3 Opening of Hostilities
- Chapter 4 The River Krian
- Chapter 5 The Malayan Campaign
- Chapter 6 The Fall of Singapore
- Chapter 7 Surrender
- Chapter 8 Shōnan: Light of the South
- Chapter 9 The Thai-Burma Railway
- Chapter 10 Preparing Construction
- Chapter 11 Banpong
- Chapter 12 Prisoners-of-War
- Chapter 13 Constructing the Railway
- Chapter 14 Thailand
- Chapter 15 The River Kwae Noi
- Chapter 16 The Mae Khlaung Bridge
- Chapter 17 Kanchanaburi
- Chapter 18 The Jungle
- Chapter 19 From Bangkok to Singapore
- Chapter 20 Rush Construction
- Chapter 21 The Base at Wanyai
- Chapter 22 The Labour Force
- Chapter 23 Survey Unit
- Chapter 24 Test Run
- Chapter 25 Bridge-Building and Shifting Earth
- Chapter 26 The Rainy Season: The Monsoon
- Chapter 27 Kinsaiyok
- Chapter 28 Diseases and Epidemics
- Chapter 29 Cattle Drive
- Chapter 30 Living in the Jungle
- Chapter 31 Soon to the Three Pagodas Pass
- Chapter 32 Towards the Setting Sun
- Chapter 33 Opening to Traffic
- Chapter 34 The Bombing
- Chapter 35 End of the War
- Chapter 36 Internment
- Chapter 37 Repatriation
- Footnote
- Postscript
- End Notes
- Glossary
- Bibliography
- Index
Chapter 20 - Rush Construction
Published online by Cambridge University Press: 13 May 2022
- Frontmatter
- Dedication
- Contents
- Acknowledgements
- Foreword
- Introduction
- Across the Three Pagodas Pass
- Translator’s Acknowledgements
- Preface
- Chapter 1 Departure for the Front
- Chapter 2 In Indo-China
- Chapter 3 Opening of Hostilities
- Chapter 4 The River Krian
- Chapter 5 The Malayan Campaign
- Chapter 6 The Fall of Singapore
- Chapter 7 Surrender
- Chapter 8 Shōnan: Light of the South
- Chapter 9 The Thai-Burma Railway
- Chapter 10 Preparing Construction
- Chapter 11 Banpong
- Chapter 12 Prisoners-of-War
- Chapter 13 Constructing the Railway
- Chapter 14 Thailand
- Chapter 15 The River Kwae Noi
- Chapter 16 The Mae Khlaung Bridge
- Chapter 17 Kanchanaburi
- Chapter 18 The Jungle
- Chapter 19 From Bangkok to Singapore
- Chapter 20 Rush Construction
- Chapter 21 The Base at Wanyai
- Chapter 22 The Labour Force
- Chapter 23 Survey Unit
- Chapter 24 Test Run
- Chapter 25 Bridge-Building and Shifting Earth
- Chapter 26 The Rainy Season: The Monsoon
- Chapter 27 Kinsaiyok
- Chapter 28 Diseases and Epidemics
- Chapter 29 Cattle Drive
- Chapter 30 Living in the Jungle
- Chapter 31 Soon to the Three Pagodas Pass
- Chapter 32 Towards the Setting Sun
- Chapter 33 Opening to Traffic
- Chapter 34 The Bombing
- Chapter 35 End of the War
- Chapter 36 Internment
- Chapter 37 Repatriation
- Footnote
- Postscript
- End Notes
- Glossary
- Bibliography
- Index
Summary
On 1 January 1943, at Sakamoto Unit HQ at Wanyai we decorated our billets with the shichi-go-san (7–5-3, lucky numbers) ornaments, but in bamboo only, for New Year's Pine & Bamboo, and on a Thai-Burma site celebrated the New Year with mochi (rice balls) made with Thai rice. In the midst of the jungle with the heat making one sweat, a hot New Year, no one was able to feel quite the full New Year spirit. We prayed for our homeland's prosperity and when we had completed the formal ceremony of bowing from afar to the Imperial Palace, many of the troops took a siesta and listened to the shrilling of the cicadas. Officers and men wondered for how many months they would be living the jungle life, bathing every day in the Kwae Noi, and bit-by-bit becoming used to enduring the heat, the dangers, the coarse food and clothing … all this was what their sense of duty led them to accept in this job.
After the previous November when the order to construct this railway was formally promulgated, the Construction Unit HQ also inaugurated it, and the GOC, Shimoda, also held an inspection of the current circumstances. Already from September the previous year trains had been running between Nong Pladuk and Kamburi, but the roadbed West of the Mae Khlaung bridge, together with work on the Chungkai cutting and the plank viaduct at points 103 and 109 km, and also the building of the bridge over the Mae Khlaung not having been completed, the situation was that the temporary wooden bridge was said to be nearing completion. The van of the Thai-side's Survey Unit was nearing Thā Khanun, but the embankment for the centre-line had not as yet reached Kinsaiyok. On the other side, the survey in Burma had got as far as Nikki in November, but the roadbed had only reached Thanbyusayat. Engineering had been planned to take one or two months until the end of the year, but the volume of work on Thaiside which remained to be done, together with that on Burma-side, added up to over two-thirds of the total volume of work.
- Type
- Chapter
- Information
- Across the Three Pagodas PassThe Story of the Thai-Burma Railway, pp. 94 - 99Publisher: Amsterdam University PressPrint publication year: 2013