Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Sheu, Shey-Huei
1998.
A generalized age and block replacement of a system subject to shocks.
European Journal of Operational Research,
Vol. 108,
Issue. 2,
p.
345.
Sheu, Shey-Huei
1999.
Extended optimal replacement model for deteriorating systems.
European Journal of Operational Research,
Vol. 112,
Issue. 3,
p.
503.
Tsai, Chih-Hung
and
Chang, Cheng-Chang
2003.
Two alternative imperfect multiaction maintenance models.
Engineering Optimization,
Vol. 35,
Issue. 2,
p.
215.
2005.
Maintenance Theory of Reliability.
p.
117.
Chien, Yu-Hung
2008.
Number-dependent replacement model with random lead-time for systems under maintenance continuously.
International Journal of Systems Science,
Vol. 39,
Issue. 10,
p.
995.
Chien, Yu-Hung
Sheu, Shey-Huei
and
Chang, Chin-Chih
2009.
Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time.
International Journal of Systems Science,
Vol. 40,
Issue. 7,
p.
703.
Chien, Yu-Hung
2009.
A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times.
Applied Mathematical Modelling,
Vol. 33,
Issue. 3,
p.
1708.
Chang, Chin-Chih
Sheu, Shey-Huei
and
Chen, Yen-Luan
2010.
Optimal number of minimal repairs before replacement based on a cumulative repair-cost limit policy.
Computers & Industrial Engineering,
Vol. 59,
Issue. 4,
p.
603.
Sheu, Shey-Huei
Chang, Chin-Chih
and
Chen, Yen-Luan
2010.
A Generalized Periodic Preventive Maintenance Model With Virtual Age for a System Subjected to Shocks.
Communications in Statistics - Theory and Methods,
Vol. 39,
Issue. 13,
p.
2379.
Chien, Yu-Hung
Chang, Chin-Chih
and
Sheu, Shey-Huei
2010.
Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy.
Annals of Operations Research,
Vol. 181,
Issue. 1,
p.
723.
Sheu, Shey-Huei
Chang, Chin-Chih
Chen, Yen-Luan
and
Zhang, Zhe George
2010.
A Periodic Replacement Model Based on Cumulative Repair-Cost Limit for a System Subjected to Shocks.
IEEE Transactions on Reliability,
Vol. 59,
Issue. 2,
p.
374.
Park, Minjae
and
Pham, Hoang
2011.
Safety and Risk Modeling and Its Applications.
p.
101.
Sheu, Shey-Huei
Chang, Chin-Chih
and
Chien, Yu-Hung
2011.
Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks.
Annals of Operations Research,
Vol. 186,
Issue. 1,
p.
317.
Shey-Huei Sheu
Yen-Luan Chen
Chin-Chih Chang
and
Zhang, Z. G.
2012.
A Block Replacement Policy for Systems Subject to Non-homogeneous Pure Birth Shocks.
IEEE Transactions on Reliability,
Vol. 61,
Issue. 3,
p.
741.
Sheu, Shey-Huei
Tsai, Hsin-Nan
Wang, Fu-Kwun
and
Zhang, Zhe George
2015.
An extended optimal replacement model for a deteriorating system with inspections.
Reliability Engineering & System Safety,
Vol. 139,
Issue. ,
p.
33.